{"id":1518,"date":"2024-06-10T19:35:55","date_gmt":"2024-06-10T17:35:55","guid":{"rendered":"https:\/\/albyptx.com\/?p=1518"},"modified":"2024-06-12T09:16:04","modified_gmt":"2024-06-12T07:16:04","slug":"storasen-wind-farm-approved-by-ange-municipality","status":"publish","type":"post","link":"https:\/\/albyptx.com\/en\/2024\/06\/10\/storasen-wind-farm-approved-by-ange-municipality\/","title":{"rendered":"Stor\u00e5sen wind farm approved by \u00c5nge municipality"},"content":{"rendered":"\n<p><strong>Today, June 10, 2024, Stor\u00e5sen wind farm was approved by \u00c5nge municipality in the municipal council. Stor\u00e5sen, which consists of 24 turbines, will contribute a total of 500 GWh to the energy mix in SE2 &#8211; which corresponds to 50% of the energy supply for Ljungaverk&#8217;s hydrogen plant.<\/strong><\/p>\n\n\n\n<p>\u2013 We are very happy about the municipality&#8217;s decision to support Stor\u00e5sen. In recent years, we at RES have become a player to be reckoned with in \u00c5nge and we are deeply committed to the green development that the municipality is undergoing. Our commitment started with Bj\u00f6rnberget and Gubbaberget wind farms, but today we develop wind, battery storage and green hydrogen in the municipality, says Rasmus Adelsw\u00e4rd, project developer at RES for Stor\u00e5sen.<\/p>\n\n\n\n<p>The municipal approval means that the municipality supports the location of the park and considers that the use of the land for wind power is appropriate. In a next step, official permission from the county administrative board is awaited before the park can be built.<\/p>\n\n\n\n<p>\u2013 By supporting Stor\u00e5sen, \u00c5nge municipality is making an important and responsible decision. In order to secure the electricity production that we need, it is necessary that we all help each other and do what we can in our respective positions. We now hope that more municipalities follow \u00c5nge&#8217;s example and not only enable development in their own regions, but also help Sweden towards an increased, stable and sustainable energy supply, says Matilda Afzelius, CEO of RES in the Nordics.<\/p>\n\n\n\n<p>\u2013 The project area has very good wind conditions and does not include areas of national interest, nature reserves, or areas with similar protection. The site is well suited for wind power and follows the guidelines in \u00c5nge municipality&#8217;s master plan. The majority of the project area is designated national interest for wind farms, an aspect that is of great importance when assessing whether a location is suitable, says Rasmus Adelsw\u00e4rd.<\/p>\n\n\n\n<p>Stor\u00e5sen wind farm will supply renewable energy to Tov\u00e5sen grid station, which in turn will be the hub for the two large-scale hydrogen plants that RES is developing in \u00c5nge. The energy production from Stor\u00e5sen corresponds to half of the energy needs for Ljungaverk&#8217;s green hydrogen plant.<\/p>\n\n\n\n<p>In addition to the increase in green electricity production in the area, the Stor\u00e5sen wind farm contributes significant local values. During the development and construction of the park, for example, an increase in jobs is expected, more precisely one job per four turbines. From development and throughout Stor\u00e5sens, the village also gets to take part in RES Powerbank, RES&#8217; own concept for sponsorship and village funds.<\/p>\n\n\n\n<p>\u2013 \u00c5nge municipality has a vision of becoming a hub for green energy and the approval of Stor\u00e5sen is another piece of the puzzle to get there. The combination of a large production of renewable energy, a strong grid connection and green hydrogen production creates a huge attraction for new industrial establishments and thus jobs. The total investment level of the projects that RES has developed and is developing in \u00c5nge is 20-30 billion SEK. This is a brilliant example of how renewable development can create local value, says Matilda Afzelius.<\/p>\n\n\n\n<p><strong>For more information, contact:<\/strong><\/p>\n\n\n\n<p>Rasmus Adelsw\u00e4rd<br><a href=\"mailto:rasmus.adelsward@res-group.com\">rasmus.adelsward@res-group.com<br><\/a>+46 735 24 99 22<\/p>\n\n\n\n<p><strong>About RES<\/strong><\/p>\n\n\n\n<p>RES is the world\u2019s largest independent renewable energy company, working across 24 countries and active in wind, solar, energy storage, biomass, hydro, green hydrogen, transmission, and distribution.&nbsp; An industry innovator for over 40 years, RES has delivered more than 24 GW of renewable energy projects across the globe and plans to bring more than 22 GW of new capacity online in the next five years.<\/p>\n\n\n\n<p>As a service provider, RES has the skills and experience in asset management, operations and maintenance (O&amp;M), and spare parts \u2013 supporting 41GW of renewable assets across 1,300 sites. RES brings to the market a range of purposeful, practical technology-based products and digital solutions designed to maximise investment and deployment of renewable energy.<\/p>\n\n\n\n<p>RES is the power behind a clean energy future where everyone has access to affordable zero carbon energy bringing together global experience, passion, and the innovation of its 4,500 people to transform the way energy is generated, stored and supplied. Visit: <a href=\"http:\/\/www.res-group.com\/\">www.res-group.com<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Today, June 10, 2024, Stor\u00e5sen wind farm was approved by \u00c5nge municipality in the municipal council. Stor\u00e5sen, which consists of 24 turbines, will contribute a total of 500 GWh to the energy mix in SE2 &#8211; which corresponds to 50% of the energy supply for Ljungaverk&#8217;s hydrogen plant. \u2013 We are very happy about the municipality&#8217;s decision to support Stor\u00e5sen. &#8230; <\/p>\n<div><a href=\"https:\/\/albyptx.com\/en\/2024\/06\/10\/storasen-wind-farm-approved-by-ange-municipality\/\" class=\"more-link\">Read More<\/a><\/div>\n","protected":false},"author":1,"featured_media":1507,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[27],"tags":[],"class_list":["post-1518","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-green-hydrogen-alby"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.4 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Stor\u00e5sen wind farm approved by \u00c5nge municipality - Alby PtX<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/albyptx.com\/en\/2024\/06\/10\/storasen-wind-farm-approved-by-ange-municipality\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Stor\u00e5sen wind farm approved by \u00c5nge municipality - Alby PtX\" \/>\n<meta property=\"og:description\" content=\"Today, June 10, 2024, Stor\u00e5sen wind farm was approved by \u00c5nge municipality in the municipal council. Stor\u00e5sen, which consists of 24 turbines, will contribute a total of 500 GWh to the energy mix in SE2 &#8211; which corresponds to 50% of the energy supply for Ljungaverk&#8217;s hydrogen plant. \u2013 We are very happy about the municipality&#8217;s decision to support Stor\u00e5sen. ... Read More\" \/>\n<meta property=\"og:url\" content=\"https:\/\/albyptx.com\/en\/2024\/06\/10\/storasen-wind-farm-approved-by-ange-municipality\/\" \/>\n<meta property=\"og:site_name\" content=\"Alby PtX\" \/>\n<meta property=\"article:published_time\" content=\"2024-06-10T17:35:55+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-06-12T07:16:04+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/albyptx.com\/wp-content\/uploads\/2024\/06\/hela-systemet-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1317\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"ConsultantLogin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"ConsultantLogin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/albyptx.com\/en\/2024\/06\/10\/storasen-wind-farm-approved-by-ange-municipality\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/albyptx.com\/en\/2024\/06\/10\/storasen-wind-farm-approved-by-ange-municipality\/\"},\"author\":{\"name\":\"ConsultantLogin\",\"@id\":\"https:\/\/albyptx.com\/en\/#\/schema\/person\/65000fc6f6c2b57f7cee4a6f8704d68c\"},\"headline\":\"Stor\u00e5sen wind farm approved by \u00c5nge municipality\",\"datePublished\":\"2024-06-10T17:35:55+00:00\",\"dateModified\":\"2024-06-12T07:16:04+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/albyptx.com\/en\/2024\/06\/10\/storasen-wind-farm-approved-by-ange-municipality\/\"},\"wordCount\":711,\"publisher\":{\"@id\":\"https:\/\/albyptx.com\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/albyptx.com\/en\/2024\/06\/10\/storasen-wind-farm-approved-by-ange-municipality\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/albyptx.com\/wp-content\/uploads\/2024\/06\/hela-systemet-scaled.jpg\",\"articleSection\":[\"Green Hydrogen Alby\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/albyptx.com\/en\/2024\/06\/10\/storasen-wind-farm-approved-by-ange-municipality\/\",\"url\":\"https:\/\/albyptx.com\/en\/2024\/06\/10\/storasen-wind-farm-approved-by-ange-municipality\/\",\"name\":\"Stor\u00e5sen wind farm approved by \u00c5nge municipality - Alby PtX\",\"isPartOf\":{\"@id\":\"https:\/\/albyptx.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/albyptx.com\/en\/2024\/06\/10\/storasen-wind-farm-approved-by-ange-municipality\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/albyptx.com\/en\/2024\/06\/10\/storasen-wind-farm-approved-by-ange-municipality\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/albyptx.com\/wp-content\/uploads\/2024\/06\/hela-systemet-scaled.jpg\",\"datePublished\":\"2024-06-10T17:35:55+00:00\",\"dateModified\":\"2024-06-12T07:16:04+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/albyptx.com\/en\/2024\/06\/10\/storasen-wind-farm-approved-by-ange-municipality\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/albyptx.com\/en\/2024\/06\/10\/storasen-wind-farm-approved-by-ange-municipality\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/albyptx.com\/en\/2024\/06\/10\/storasen-wind-farm-approved-by-ange-municipality\/#primaryimage\",\"url\":\"https:\/\/albyptx.com\/wp-content\/uploads\/2024\/06\/hela-systemet-scaled.jpg\",\"contentUrl\":\"https:\/\/albyptx.com\/wp-content\/uploads\/2024\/06\/hela-systemet-scaled.jpg\",\"width\":2560,\"height\":1317},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/albyptx.com\/en\/2024\/06\/10\/storasen-wind-farm-approved-by-ange-municipality\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Hem\",\"item\":\"https:\/\/albyptx.com\/en\/home\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Stor\u00e5sen wind farm approved by \u00c5nge municipality\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/albyptx.com\/en\/#website\",\"url\":\"https:\/\/albyptx.com\/en\/\",\"name\":\"Alby PtX\",\"description\":\"Paving the way for Sustainable Aviation Fuel\",\"publisher\":{\"@id\":\"https:\/\/albyptx.com\/en\/#organization\"},\"alternateName\":\"Hydrogen Alby\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/albyptx.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/albyptx.com\/en\/#organization\",\"name\":\"RES Renewable Norden\",\"url\":\"https:\/\/albyptx.com\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/albyptx.com\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/albyptx.com\/wp-content\/uploads\/2022\/10\/logo-res-alby.png\",\"contentUrl\":\"https:\/\/albyptx.com\/wp-content\/uploads\/2022\/10\/logo-res-alby.png\",\"width\":268,\"height\":171,\"caption\":\"RES Renewable Norden\"},\"image\":{\"@id\":\"https:\/\/albyptx.com\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.linkedin.com\/showcase\/res-nordics-\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/albyptx.com\/en\/#\/schema\/person\/65000fc6f6c2b57f7cee4a6f8704d68c\",\"name\":\"ConsultantLogin\",\"sameAs\":[\"http:\/\/albyptx.com.hemsida.eu\"],\"url\":\"https:\/\/albyptx.com\/en\/author\/consultantlogin\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Stor\u00e5sen wind farm approved by \u00c5nge municipality - Alby PtX","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/albyptx.com\/en\/2024\/06\/10\/storasen-wind-farm-approved-by-ange-municipality\/","og_locale":"en_US","og_type":"article","og_title":"Stor\u00e5sen wind farm approved by \u00c5nge municipality - Alby PtX","og_description":"Today, June 10, 2024, Stor\u00e5sen wind farm was approved by \u00c5nge municipality in the municipal council. Stor\u00e5sen, which consists of 24 turbines, will contribute a total of 500 GWh to the energy mix in SE2 &#8211; which corresponds to 50% of the energy supply for Ljungaverk&#8217;s hydrogen plant. \u2013 We are very happy about the municipality&#8217;s decision to support Stor\u00e5sen. ... Read More","og_url":"https:\/\/albyptx.com\/en\/2024\/06\/10\/storasen-wind-farm-approved-by-ange-municipality\/","og_site_name":"Alby PtX","article_published_time":"2024-06-10T17:35:55+00:00","article_modified_time":"2024-06-12T07:16:04+00:00","og_image":[{"width":2560,"height":1317,"url":"https:\/\/albyptx.com\/wp-content\/uploads\/2024\/06\/hela-systemet-scaled.jpg","type":"image\/jpeg"}],"author":"ConsultantLogin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"ConsultantLogin","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/albyptx.com\/en\/2024\/06\/10\/storasen-wind-farm-approved-by-ange-municipality\/#article","isPartOf":{"@id":"https:\/\/albyptx.com\/en\/2024\/06\/10\/storasen-wind-farm-approved-by-ange-municipality\/"},"author":{"name":"ConsultantLogin","@id":"https:\/\/albyptx.com\/en\/#\/schema\/person\/65000fc6f6c2b57f7cee4a6f8704d68c"},"headline":"Stor\u00e5sen wind farm approved by \u00c5nge municipality","datePublished":"2024-06-10T17:35:55+00:00","dateModified":"2024-06-12T07:16:04+00:00","mainEntityOfPage":{"@id":"https:\/\/albyptx.com\/en\/2024\/06\/10\/storasen-wind-farm-approved-by-ange-municipality\/"},"wordCount":711,"publisher":{"@id":"https:\/\/albyptx.com\/en\/#organization"},"image":{"@id":"https:\/\/albyptx.com\/en\/2024\/06\/10\/storasen-wind-farm-approved-by-ange-municipality\/#primaryimage"},"thumbnailUrl":"https:\/\/albyptx.com\/wp-content\/uploads\/2024\/06\/hela-systemet-scaled.jpg","articleSection":["Green Hydrogen Alby"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/albyptx.com\/en\/2024\/06\/10\/storasen-wind-farm-approved-by-ange-municipality\/","url":"https:\/\/albyptx.com\/en\/2024\/06\/10\/storasen-wind-farm-approved-by-ange-municipality\/","name":"Stor\u00e5sen wind farm approved by \u00c5nge municipality - Alby PtX","isPartOf":{"@id":"https:\/\/albyptx.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/albyptx.com\/en\/2024\/06\/10\/storasen-wind-farm-approved-by-ange-municipality\/#primaryimage"},"image":{"@id":"https:\/\/albyptx.com\/en\/2024\/06\/10\/storasen-wind-farm-approved-by-ange-municipality\/#primaryimage"},"thumbnailUrl":"https:\/\/albyptx.com\/wp-content\/uploads\/2024\/06\/hela-systemet-scaled.jpg","datePublished":"2024-06-10T17:35:55+00:00","dateModified":"2024-06-12T07:16:04+00:00","breadcrumb":{"@id":"https:\/\/albyptx.com\/en\/2024\/06\/10\/storasen-wind-farm-approved-by-ange-municipality\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/albyptx.com\/en\/2024\/06\/10\/storasen-wind-farm-approved-by-ange-municipality\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/albyptx.com\/en\/2024\/06\/10\/storasen-wind-farm-approved-by-ange-municipality\/#primaryimage","url":"https:\/\/albyptx.com\/wp-content\/uploads\/2024\/06\/hela-systemet-scaled.jpg","contentUrl":"https:\/\/albyptx.com\/wp-content\/uploads\/2024\/06\/hela-systemet-scaled.jpg","width":2560,"height":1317},{"@type":"BreadcrumbList","@id":"https:\/\/albyptx.com\/en\/2024\/06\/10\/storasen-wind-farm-approved-by-ange-municipality\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Hem","item":"https:\/\/albyptx.com\/en\/home\/"},{"@type":"ListItem","position":2,"name":"Stor\u00e5sen wind farm approved by \u00c5nge municipality"}]},{"@type":"WebSite","@id":"https:\/\/albyptx.com\/en\/#website","url":"https:\/\/albyptx.com\/en\/","name":"Alby PtX","description":"Paving the way for Sustainable Aviation Fuel","publisher":{"@id":"https:\/\/albyptx.com\/en\/#organization"},"alternateName":"Hydrogen Alby","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/albyptx.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/albyptx.com\/en\/#organization","name":"RES Renewable Norden","url":"https:\/\/albyptx.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/albyptx.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/albyptx.com\/wp-content\/uploads\/2022\/10\/logo-res-alby.png","contentUrl":"https:\/\/albyptx.com\/wp-content\/uploads\/2022\/10\/logo-res-alby.png","width":268,"height":171,"caption":"RES Renewable Norden"},"image":{"@id":"https:\/\/albyptx.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/showcase\/res-nordics-\/"]},{"@type":"Person","@id":"https:\/\/albyptx.com\/en\/#\/schema\/person\/65000fc6f6c2b57f7cee4a6f8704d68c","name":"ConsultantLogin","sameAs":["http:\/\/albyptx.com.hemsida.eu"],"url":"https:\/\/albyptx.com\/en\/author\/consultantlogin\/"}]}},"_links":{"self":[{"href":"https:\/\/albyptx.com\/en\/wp-json\/wp\/v2\/posts\/1518","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/albyptx.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/albyptx.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/albyptx.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/albyptx.com\/en\/wp-json\/wp\/v2\/comments?post=1518"}],"version-history":[{"count":1,"href":"https:\/\/albyptx.com\/en\/wp-json\/wp\/v2\/posts\/1518\/revisions"}],"predecessor-version":[{"id":1519,"href":"https:\/\/albyptx.com\/en\/wp-json\/wp\/v2\/posts\/1518\/revisions\/1519"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/albyptx.com\/en\/wp-json\/wp\/v2\/media\/1507"}],"wp:attachment":[{"href":"https:\/\/albyptx.com\/en\/wp-json\/wp\/v2\/media?parent=1518"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/albyptx.com\/en\/wp-json\/wp\/v2\/categories?post=1518"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/albyptx.com\/en\/wp-json\/wp\/v2\/tags?post=1518"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}